24 November 2011




Posted by chait2000 at 11:17 AM
Newer Post Older Post Home

Blog Archive

  • ►  2012 (10)
    • ►  May (10)
  • ▼  2011 (21)
    • ▼  December (8)
      • 12/12 Column work in progress
      • 07/12 Column work for the first floor
      • 24/11 Concreting of first roof
      • 24/11 Pooja before Concreting of first roof
      • 22/11 fixing of steel rods for the roof and electr...
      • 11/11 Centering work (fixing sheets for laying con...
      • 31/10 Casting of Lintels and staircase base
      • 06/10 Column and brick work for the ground floor