Protection Apartments

Monday, December 12, 2011

12/12 Column work in progress

12 December 2011



Posted by chait2000 at 2:42 PM

07/12 Column work for the first floor

07 December 2011





Posted by chait2000 at 2:38 PM

24/11 Concreting of first roof

24 November 2011




Posted by chait2000 at 11:17 AM

24/11 Pooja before Concreting of first roof

24 November 2011



Posted by chait2000 at 11:10 AM

22/11 fixing of steel rods for the roof and electrical work

22 November 2011




Posted by chait2000 at 11:08 AM

11/11 Centering work (fixing sheets for laying concrete for the roof)

11 November 2011



Posted by chait2000 at 11:03 AM

31/10 Casting of Lintels and staircase base

31 October 2011







Posted by chait2000 at 11:00 AM

06/10 Column and brick work for the ground floor


06 October 2011




Posted by chait2000 at 10:53 AM
Newer Posts Older Posts Home
Subscribe to: Comments (Atom)

Blog Archive

  • ►  2012 (10)
    • ►  May (10)
  • ▼  2011 (21)
    • ▼  December (8)
      • 12/12 Column work in progress
      • 07/12 Column work for the first floor
      • 24/11 Concreting of first roof
      • 24/11 Pooja before Concreting of first roof
      • 22/11 fixing of steel rods for the roof and electr...
      • 11/11 Centering work (fixing sheets for laying con...
      • 31/10 Casting of Lintels and staircase base
      • 06/10 Column and brick work for the ground floor
    • ►  August (4)
    • ►  June (9)
Picture Window theme. Powered by Blogger.